Ahmedabad Metro Phase 1 Contractors

 

Contract

Contractor

General Consultant (GC) ServiceSYSTRA – RITES – Oriental – AECOM JV
Detailed Design Consultant (DDC) Service for East-West Line-1TCPL – Aarvee JV
Detailed Design Consultant (DDC) Service for North-South Line-2STUP Consultants
Detailed Design Consultant (DDC) Service for Apparel Park DepotRITES
Detailed Design Consultant (DDC) Service for Gyaspur DepotRITES
Independent Safety Assessor (ISA) ServiceCertifer SA
96 Coach Rolling StockHyundai Rotem
Signaling and Train Control SystemsNippon Signal
Automatic Fare Collection (AFC)Nippon Signal
Telecommunication SystemLarsen & Toubro
Platform Screen DoorsShenzhen Fangda Automatic System Co. Ltd.
Elevators (Lifts) – Lot 1Johnson Lifts Pvt. Ltd. – SJEC Corporation JV
Escalators – Lot 2Certifer SA (France)
Ballastless Track-workLarsen & Toubro
Head Hardened RailsMitsui Ltd.
UIC60/60E1 TurnoutsConsortium of Vossloh Cogifer SA, Vossloh Cogifer Turnouts India Pvt. Ltd. and Vossloh Beekay Casting Ltd
3500 MT UIC60/60E1, IRS- T12- 2009, 880 Grade RailsSteel Authority of India Ltd.
10600 MT UIC 60/60E1, IRS-T12-2009, 1080 Grade Head Hardened RailsMitsui & Co.
3500 MT UIC60/60E1, IRS- T12- 2009, 880 Grade RailsSteel Authority of India Ltd. (SAIL)
Power Supply Receiving & Distribution System, 750 V DC Third Rail Traction Electrification and SCADA SystemSiemens Ltd. (India) – Siemens AG (Germany) JV
Tunnel Ventilation System (TVS)Sterling & Wilson – Zhejiang Jindun Fans JV
CNC Under-floor Wheel Lathe and Electric ShunterHYT Engineering Company
Apparel Park Depot’s ConstructionURC Construction
Gypaspur Depot’s ConstructionGannon Dunkerly – PSPO JV
Vastral Gam – Apparel Park
(Viaduct – 6 km)
J Kumar Infraprojects
Vastral Gam – Apparel Park
(6 Stations)
DRA – CICO JV
Gyaspur Depot – Shreyas
(Viaduct & 4 Stations – 4.62 km)
IL&FS Engineering
Motera – Ranip
(Viaduct – 4.85 km)
Ranjit Buildcon
Motera – Ranip
(5 Stations)
Pratibha – Ranjit JV
Shreyas to Ranip
(Viaduct & 6 stations – 8.94 km)
Simplex Infrastructure
East Ramp to Kalupur
(Tunnels & 2 stations – 2.45 km
Afcons Infrastructure
Kalupur to West Ramp
(Tunnels & 2 stations – 4.38 km)
Larsen & Toubro
Thaltej Gam to West Ramp
(Viaduct, Sabarmati Bridge  &
7 stations – 8.21 km)
Tata – CCECC JV

Comments

Popular posts from this blog

RRTS FIRST TRIAL RUN

The Delhi Meerut Rapid Rail completed a successful maiden test run on its depot track. Making the announcement of the development in a tweet, the National Capital Region Transport Corporation Limited said that the successful test run was a “milestone achievement” on the way to completing the country’s first Regional Rail project on time. Last month, the power supply work on the rapid rail line was initiated by the officials, starting with the overhead equipment (OHE) on the route. For this, the OHE section on the inspection line (IBL) built at the Duhai depot was charged at 25000 volts. After this, preparations for the first trial run began. The NCRTC has set the target of 2023 to start operation on the 17-km stretch between Sahibabad and Duhai on the primary section of the corridor. The corridor will cover five stations, Sahibabad, Ghaziabad, Guldhar, Duhai, and Duhai depots. Railway officials while briefing the media, said that this maiden test was to check the power supply to the tr...

Mumbai–Ahmedabad High Speed Rail

Mumbai–Ahmedabad High Speed Rail Corridor  (MAHSR) or Mumbai–Ahmedabad HSR is an under-construction  high-speed rail  line connecting India's economic hub  Mumbai  with the city of  Ahmedabad . When completed, it will be India's first high-speed rail line.