Ahmedabad Metro – Information, Route Maps, Fares, Tenders & Updates

Information

Ahmedabad Metro is an urban Mass Rapid Transit System (MRTS) being built by Gujarat Metro Rail Corporation (GMRC) Limited, formerly known as ‘Metro-Link Express for Gandhinagar and Ahmedabad’ (MEGA), to serve Ahmedabad – Gujarat’s biggest city and its capital, Gandhinagar, in the future.

Construction work on Ahmedabad Metro’s Phase 1 with routes of 39.259 km started in 2015 and is expected to be completed in 2024.

In February 2016, the Gujarat state government allocated a sum of Rs 2 crore in its 2016-17 state budget and appointed the Delhi Metro Rail Corporation (DMRC) to prepare Phase 2’s Detailed Project Report (DPR). As per the draft DPR, the 18.522 km Line-2 is planned to be extended northward to connect Mahatma Mandir in Gandhinagar and will feature 1 branch/spur lines to GIFT City – view more information here.

In February 2019, India’s Union Cabinet approved the construction of a 28.254 km Phase 2 with 2 corridors – a northward extension of Line-2 with a short spur. Its foundation stone was laid by the Prime Minister on March 4, 2019.

System Specifications

  • Top Speed: 80 kmph
  • Average Speed: 33 kmph
  • Track Gauge: Standard Gauge – 1435 mm
  • Electrification: 750 V DC Third Rail
  • Signalling: Communication-based Train Control (CBTC)

Key Figures

Operational: 6 km (Phase 1) | Under Construction: 54.1 km (Phase 1 , Phase 2) | Approved: 7.41 km (Phase 2)

  • Daily Ridership: 35,000/day (February 2020)
  • Rolling Stock: 96 coaches (32 train-sets x 3) supplied by Hyundai Rotem

Operational Lines (Phase 1)

  • Line-1  Blue Line: Vastral Gaam – Apparel Park (6 km, 6 stations)

Under Construction Lines (Phase 1Phase 2)

  • Line-1  Blue Line: Apparel Park – Thaltej Gam (14.737 km, 14 stations)
  • Line-2  – Red Line: Motera – APMC (18.522 km, 16 stations)
  • Line-2  – Red Line: Motera – GNLU – Gandhinagar Sector 1 (14.60 km, 13 stations)
  • Line-3 (Eastern Spur of Line-2): Gujarat National Law University (GNLU) – GIFT City (5.416 km, 2 stations)

Note: Blue Line is also known as East-West Line. Red Line is also known as North – South Line.

Approved Lines (Phase 2)

  • Line-2  Red Line: Gandhinagar Sector 1 to Mahatma Mandir (7.41 km, 7 stations)
    Note – Tendering / biddnig process for this section has not started

Construction work first started on the 6 km Apparel Park to Vastral Gam section of the Blue Line in 2015, which opened to the public on March 6, 2019. MEGA completed inviting construction bids for all other pending sections in July 2016 and awarded the final civil contract in February 2017. These under construction sections are expected to open one after the other between 2020-2023.

Ahmedabad Metro Route Map (Operational)

The embedded maps below shows the exact location of all stations and can be zoomed into!

Ahmedabad Metro Phase 1 Route Map (Operational & Under Construction)

An official PDF route map of Ahmedabad Metro will be added here when available.

Future Network Route Map: Phase 1 & 2 – By Line

Key for map below: Line 1 | Line 2 | Line 3

Future Network Route Map: Phase 1 & 2 – By Phase

Key for map below: Phase 1 (operational & under construction)Phase 2 (under construction)

Ahmedabad Metro Fares (Ticket Prices)

Ahmedabad Metro’s fare chart has not been published by GMRC online. On the 6 km operational line (Apparel Park – Vastral Gam), a ride on the first 2.5 km costs Rs. 5 and thereafter the fare is Rs. 10. End to end rides on the entire line (Thaltej Gam – Vastral Gam) are planned to cost Rs. 25.

Ahmedabad Metro Tenders

Latest Ahmedabad Metro (GMRC) tenders can be viewed on the GMRC’s website.

Ahmedabad Metro History (Key Dates)

Phase 1
• 6 March 2019: Vastral – Apparel Park (Blue Line) – 6 km

Comments

  1. ALWAYS TRY TO DO BEST
    BEST INFORMATION
    THANK FOR GIVING ME INFORMATION 😇😇

    ReplyDelete

Post a Comment

Popular posts from this blog

RRTS FIRST TRIAL RUN

The Delhi Meerut Rapid Rail completed a successful maiden test run on its depot track. Making the announcement of the development in a tweet, the National Capital Region Transport Corporation Limited said that the successful test run was a “milestone achievement” on the way to completing the country’s first Regional Rail project on time. Last month, the power supply work on the rapid rail line was initiated by the officials, starting with the overhead equipment (OHE) on the route. For this, the OHE section on the inspection line (IBL) built at the Duhai depot was charged at 25000 volts. After this, preparations for the first trial run began. The NCRTC has set the target of 2023 to start operation on the 17-km stretch between Sahibabad and Duhai on the primary section of the corridor. The corridor will cover five stations, Sahibabad, Ghaziabad, Guldhar, Duhai, and Duhai depots. Railway officials while briefing the media, said that this maiden test was to check the power supply to the tr...

Mumbai–Ahmedabad High Speed Rail

Mumbai–Ahmedabad High Speed Rail Corridor  (MAHSR) or Mumbai–Ahmedabad HSR is an under-construction  high-speed rail  line connecting India's economic hub  Mumbai  with the city of  Ahmedabad . When completed, it will be India's first high-speed rail line.

Ahmedabad Metro Phase 1 Contractors

  Contract Contractor General Consultant (GC) Service SYSTRA – RITES – Oriental – AECOM JV Detailed Design Consultant (DDC) Service for East-West Line-1 TCPL – Aarvee JV Detailed Design Consultant (DDC) Service for North-South Line-2 STUP Consultants Detailed Design Consultant (DDC) Service for Apparel Park Depot RITES Detailed Design Consultant (DDC) Service for Gyaspur Depot RITES Independent Safety Assessor (ISA) Service Certifer SA 96 Coach Rolling Stock Hyundai Rotem Signaling and Train Control Systems Nippon Signal Automatic Fare Collection (AFC) Nippon Signal Telecommunication System Larsen & Toubro Platform Screen Doors Shenzhen Fangda Automatic System Co. Ltd. Elevators (Lifts) – Lot 1 Johnson Lifts Pvt. Ltd. – SJEC Corporation JV Escalators – Lot 2 Certifer SA (France) Ballastless Track-work Larsen & Toubro Head Hardened Rails Mitsui Ltd. UIC60/60E1 Turnouts Consortium of Vossloh Cogifer SA, Vossloh Cogifer Turnouts India Pvt. Ltd. and Vossloh Beekay Casting Ltd 3...